Renovation support

Minergie renovation in canton Jura: what remains in 2026

Since 10 September 2026, Jura no longer subsidises a full renovation under the Minergie label (measure M-12): the 2026 budget is exhausted, and the order of the Department of the Environment has removed it from the programme. An envelope renovation can still be supported by two measures: insulation (M-01), whose new applications go on a waiting list, and the envelope-efficiency bonus (IP-14), funded by the Confederation and still open.

The amounts shown below are those of the measures still in force. The 2027 programme will be set by a new order: nothing guarantees that M-12, or its rate, will return.

Covered rates and scope

Building envelope

Thermal envelope insulation (M-01)

CHF 40 /m²

Building built before 2000

Open official source
Building envelope

Building-envelope efficiency bonus (IP-14)

Building built before 2000

Open official source

Indicative official rate. The final amount depends on the application and cantonal decision.

Who can apply

  • Any natural or legal person, under private or public law, who owns a building in canton Jura.
  • A building permitted before 2000, whose envelope is insulated on parts already heated.
  • For the IP-14 bonus: a renovation that brings the envelope to CECB class C or B.

What is not subsidised

  • Full renovation under the Minergie or Minergie-P label (M-12): stopped for 2026 since 10 September.
  • New buildings, extensions and added storeys.
  • Works started before the application was registered on the online platform.
  • Replacing a heating system of 70 kW or less: wood, heat pumps and heat networks are also stopped for 2026.

Conditions of the two remaining measures

  1. The building was permitted before 2000: the condition applies to the insulation and to the bonus alike.
  2. Only parts already heated count; windows, doors and insulation against unheated rooms do not qualify.
  3. The IP-14 bonus requires an envelope in CECB class C or B after the works, shown by a CECB supplied with the application.
  4. Total support, the bonus included, stays below half of the investment and below the cantonal cap per building.

The application, step by step

  1. Have a CECB drawn up: it sets the energy reference area and the envelope class targeted for the bonus.
  2. Register the application on the Buildings Programme's online platform before works start.
  3. Print the form, sign it and post it with the supporting documents: its date of receipt sets the place on the insulation waiting list.
  4. After the works, submit the completion notice and the CECB certifying the class reached.

Check the building by address

Check the building by address

The address identifies the canton and prepares an initial view of plausible support.

Submit the application and wait for the decision required by the programme before starting work or making a binding commitment.

Frequently asked questions

Is Minergie renovation still subsidised in canton Jura in 2026?

No. The order of 10 September 2026 removed measure M-12 from the Jura Buildings Programme for lack of budget. A Minergie application filed today no longer qualifies for that rate in 2026.

What happens to an insulation application filed in Jura after 10 September 2026?

It goes on a waiting list, in the order the posted form is received. It is only funded if new money is released: nothing is guaranteed at this stage.

Does the IP-14 bonus stay open in canton Jura?

Yes. It belongs to the impulse programme, funded by the Confederation, whose budget remains available. It comes on top of a renovation that meets measure M-01 when the envelope reaches CECB class C or B.

Should a Minergie project in Jura wait until 2027?

The 2027 programme will be set by a new order that is not yet known. Aiming for the label remains possible, but without guaranteed cantonal support: check the future rate before committing to certification costs.

Official sources and date

retrieved on 2026-10-16