The Swiss building energy certificate, explained

An A-to-G label for the envelope and for energy, recalculated since 1 October 2026 — and, depending on the canton, an obligation on sale or the condition for receiving certain subsidies.

6 min readUpdated on 15 October 2026
On this page
  1. What the certificate measures
  2. New version since 1 October 2026: recalculated classes
  3. CECB and CECB Plus: the difference that matters
  4. When it is required
  5. The certificate is often subsidised itself
  6. What the certificate does not tell you
  7. What it costs
  8. Where to start

Anyone planning to renovate, sell or buy in Switzerland quickly runs into an acronym: CECB in French, GEAK in German. It is neither a quality label nor a general obligation — it is an energy assessment of the building. In several cantons it is required on sale or for certain subsidies, and its new version, in service since 1 October 2026, recalculates the classes.

What the certificate measures

The CECB — the cantonal building energy certificate, GEAK in German — assigns two labels from A to G. The first rates the building envelope: roof, façades, windows, floors. The second rates overall energy efficiency, which includes the heating system and hot water production.

A building can therefore be D for the envelope and B for energy if it is poorly insulated but heated by a heat pump. This distinction is the document's first benefit: it shows where the problem lies.

The certificate is drawn up by an accredited expert, based on plans, a site visit and consumption data. It is not self-declared. It remains valid for 10 years, provided no major change has altered the building's energy demand (CECB FAQ, in French).

New version since 1 October 2026: recalculated classes

Version 7 of the certificate tool has been in service since 1 October 2026. It applies a new calculation method adopted by the cantonal energy directors on 29 August 2025 (release notes, GEAK, in German):

  • New reference: the building is compared with a building that meets the MoPEC 2025, heated by a heat pump and fitted with a standard photovoltaic system. The previous reference was oil heating with 20% renewable energy.
  • Recalculated classes: for overall efficiency, classes are now calculated in 75% steps from class C upwards, instead of 50% previously. The envelope label keeps its steps.
  • Expected effect: according to the CECB/GEAK association, projects are rated on average about half a class lower, more or less depending on the building (announcement, in French).

CECB and CECB Plus: the difference that matters

It is almost always the Plus version that subsidy programmes ask for, because it contains the works scenario, not just the diagnosis.

When it is required

There is no general federal obligation to hold a certificate. Requirements come from subsidy programmes and cantonal laws.

For subsidies. The cantons' harmonised support model requires a CECB Plus from CHF 10,000 of contribution per application for thermal insulation, and a CECB Plus drawn up before the works for grants linked to a class improvement or a full renovation (harmonised support model, EnDK, in French). Some cantons go further: Neuchâtel requires a CECB Plus for any cantonal energy-efficiency subsidy.

Under cantonal law (as of 15 October 2026):

CantonRequirement
AargauGEAK Plus by end of March 2030 for buildings with electric resistance heating. Since 1.4.2025 · gesetzessammlungen.ag.ch
Basel-StadtGEAK Plus for buildings whose fossil heating is more than 15 years old. In force · gesetzessammlung.bs.ch
FribourgCECB mandatory for every building sold and every new building. Since 1.8.2013 · bdlf.fr.ch
JuraCECB mandatory when a residential building is sold, handed over before the deed. Since 1.4.2019 · rsju.jura.ch
NeuchâtelMandatory for buildings authorised before 1990 with over 1000 m² of energy reference area or at least 5 users of a central heating system; to be mentioned in the sale deed if it exists. Since 1.5.2021 · rsn.ne.ch
ValaisOptional. Since 1.1.2025 · lex.vs.ch
VaudCECB or label to be provided on sale; CECB mandatory by end of 2031 for buildings built before 1986. From 1.1.2027 · vd.ch

Geneva and Thurgau considered a mandatory certificate on sale, then dropped it: Geneva removed it from the law it adopted in 2024, and Thurgau struck it from the new energy law it adopted on 2 September 2026. The Vaud details are in our guide Vaud: new energy law.

The certificate is often subsidised itself

This is the point many owners overlook: several cantons — Vaud, Fribourg, Bern, Zurich — fund all or part of the cost of producing the certificate, through a dedicated measure in their Buildings Programme.

In other words, the document that unlocks subsidies can itself be subsidised. Some cantons go further and subsidise a class improvement: moving from one label to the next triggers a contribution.

The reverse also exists. Neuchâtel does not fund the certificate, but requires it: the cantonal energy law makes it the official certificate that gives access to subsidies. The Neuchâtel details are collected on our page energy certificate in Neuchâtel.

What the certificate does not tell you

It describes energy performance. It says nothing about what building law allows on the plot: floor-area index, heights, boundary distances, protected perimeter, noise sensitivity level. An added-storey project can be excellent in energy terms and still be refused a permit.

Nor does it replace a quote. The amounts in a CECB Plus report are orders of magnitude for comparing options, not contractor prices.

What it costs

The price is not regulated: it depends on the expert, the size of the building and the availability of plans. A detached house and a twenty-unit apartment building are not priced the same way, and a building without usable plans requires a survey.

So ask an accredited expert for a quote rather than relying on a price shown online — and check beforehand whether your canton subsidises the certificate, which changes the net cost.

Where to start

Before ordering a certificate, it helps to know which subsidies your building can target and which of them require the document: this determines whether you need the standard or the Plus version, and whether the certificate itself is subsidised where you live.

Parcellis does not issue energy certificates and is not an accredited body. We read the official cantonal rates and tell you what applies to your building, with sources.