CECBGEAK Plus
CHF 1'000 – 1'500
Mandate a GEAK expert and produce a GEAK Plus with an overall renovation variant. · File the application at the latest after the first meeting with the expert, before the report is written; the final meeting is a condition of payment.
Building built before 2000
Building envelopeThermal insulation
CHF 50 /m²
Calculate the insulated area per construction element. · Submit the request online before work begins.
Building built before 2000
WoodAutomatic wood heating <= 70 kW
from CHF 14'000
Confirm the automatic wood solution and the building category. · Submit the request online before work begins.
Heat pumpAir/water heat pump <= 70 kW
from CHF 7'000
Confirm the air/water HP and the building category. · Submit the request online before work begins.
Heat pumpGround/water or water/water heat pump <= 70 kW
from CHF 18'000
Confirm the ground/water or water/water HP source and the building category. · Submit the request online before work begins.
OtherOther support: photovoltaic supplement for heat pumps, batteries, installations above 70 kW
Identify the measure and its exact rate in the SH programme. · Submit the request online before work begins.
Building envelopeEnvelope efficiency bonus, coverage variant (IP-14)
CHF 30 /m²
Draw up the schedule of main surfaces (façade and roof) and show that at least 90% are insulated. · Compare the three variants before filing: the canton pays only one, and which is best depends on the building. · Submit the request online before work begins.
Building built before 2000
Building envelopeEnvelope efficiency bonus, CECB class variant (IP-14)
Have a CECB drawn up after the works certifying the envelope efficiency class. · Measure the energy reference area: it carries the amount, not the insulated area. · Submit the request online before work begins.
Building built before 2000
Building envelopeSupplement for opaque elements with a photovoltaic installation
Measure the area of insulation material on the elements that will carry the panels. · Submit the request online before work begins.
Building built before 2000
HeatingReplacement of decentralised heating (IP-19)
Confirm the building has NO hydraulic heat distribution system before the works. · Measure the energy reference area: above 250 m2 the amount is calculated per m2. · Submit the request online before work begins.
District heatingHeat network connection (M-07)
from CHF 12'000
Measure the connected output: above 20 kW, every further kilowatt counts. · Confirm the category: single/two-family house or multi-dwelling (3+ dwellings). · Submit the request online before work begins.
MinergieBuilding modernisation to Minergie standard (M-12)
CHF 80 – 155 /m²
Measure the energy reference area BEFORE the works: it governs if the renovation enlarges it. · Have the building certified under the Minergie rules — certification conditions the payment. · Submit the request online before work begins.
Building built before 2000
OtherMunicipal subsidies — to be searched by postal code
Search for the municipality's and the electricity provider's subsidies by postal code. · File the municipal application BEFORE the works, like the cantonal one.