CECBCECB Plus
CHF 1'000 – 1'500
Mandate a certified CECB expert before drawing up the report. · Submit the request on the Vaud Buildings Programme portal before the service. · Plan at least two variants in the report, including a complete renovation.
Building built before 2000
Building envelopeThermal insulation
CHF 40 /m²
Identify the building-envelope elements actually insulated. · Calculate the insulated area from plans, sketches or professional measurements. · Submit M-01 and any bonuses before work begins.
Building built before 2000
WoodAutomatic wood heating <= 70 kW
from CHF 8'500
Confirm the automatic wood solution and the selected power. · Prepare the declaration of conformity and SwissEnergy performance guarantee. · Submit the request before any purchase or execution.
Heat pumpAir/water heat pump <= 70 kW
from CHF 5'000
Confirm the air/water heat pump as the target solution. · Check system-module HP or quality label depending on power. · Submit the request before order or works.
Heat pumpGround/water or water/water heat pump <= 70 kW
from CHF 20'000
Confirm the ground/water or water/water HP source. · Check quality label, drilling and technical requirements. · Submit the request before order or works.
District heatingHeating network connection <= 70 kW
from CHF 6'000
Confirm the availability and renewable quality of the network. · Obtain the detailed offer from the heat supplier. · Submit the request before connection.
Solar thermalSolar thermal collectors <= 70 kW
from CHF 4'000
Confirm the nominal thermal power of the collectors. · Check that the collectors are on the recognised list and the performance guarantee. · Submit the request before installation.
MinergieComplete Minergie renovation
CHF 60 – 155 /m²
Confirm the target Minergie label. · Check the project's official ERA. · Submit the request before works with the Minergie documents.
Building built before 2000
CECBComplete CECB renovation
Produce or update the CECB Plus before fixing the variant. · Choose the CECB C/B or B/A target with the expert. · Submit the request before works.
Building built before 2000
AdvisoryPortal and municipal subsidies
Check municipal subsidies and third-party bodies before final submission. · Submit each request on the appropriate official portal before commitment. · Check the non-combination rules between measures.