Building envelopeBuilding envelope
CHF 50 /m²
Choose the official Fribourg measure applicable to the envelope. · Check the general conditions, measure sheets and documents to attach. · Check possible municipal subsidies directly with the municipality.
Building built before 2000
Building envelopeBonus for comprehensive envelope renovation (IP-14)
CHF 60 /m²
Have the share of façade and roof areas actually insulated calculated: the 90 % threshold excludes walls and floors against earth. · File the application before works start, together with measure M-01.
Building built before 2000
HeatingImpulse measures above 70 kW and self-consumption grouping
Identify whether the project concerns heating, a technical installation or solar thermal. · Check the impulse measures introduced since 2025 for outputs above 70 kWth. · Confirm submission via the official portal before works.
Heat pumpAir/water heat pump <= 70 kW
from CHF 3'500
Confirm the air/water HP solution. · Confirm the admissible thermal power. · Check the technical requirements of the Fribourg M-05 sheet.
Heat pumpGround/water or water/water heat pump <= 70 kW
from CHF 5'000
Confirm the ground/water or water/water HP solution. · Confirm the admissible thermal power. · Check drilling, label and requirements of the Fribourg M-06 sheet.
District heatingHeat network connection <= 70 kW
from CHF 5'000
Confirm the network connection as the target solution. · Confirm the admissible thermal power. · Check the network conditions per the Fribourg M-07 sheet.
CECBCECB Plus
CHF 1'000 – 1'500
Check whether a CECB Plus is required or useful for the project. · Mandate a recognised expert if the programme requires it. · Attach the CECB documents to the subsidy file.
Building built before 2000
MinergieComplete Minergie renovation
CHF 100 – 200 /m²
Confirm the targeted Minergie certification before submission. · Check the project's official ERA. · Submit the request before works.
Building built before 2000
AdvisoryEnergy optimisation of buildings with five or more dwellings
Check the number of dwellings before qualifying this option. · Identify the technical installations concerned. · Check the deadline and available budget of the programme.
WoodWood heating with a daily tank (M-02)
Gather the SwissEnergy performance guarantee, the conformity declaration (OEEE) and the performance declaration (OPCo). · File the application before works start: no subsidy is granted for works already under way (art. 24 of the 17 November 1999 Subsidies Act).
WoodAutomatic wood heating (M-03) <= 70 kW
from CHF 3'000
Gather the conformity declaration (OEEE) and the SwissEnergy performance guarantee. · File the application before works start: no subsidy is granted for works already under way (art. 24 of the 17 November 1999 Subsidies Act).
Solar thermalSolar thermal collectors (M-08)
from CHF 1'200
Check the collectors are listed on kollektorliste.ch and obtain Swissolar's validated performance guarantee. · File the application before works start: no subsidy is granted for works already under way (art. 24 of the 17 November 1999 Subsidies Act).
HeatingFirst installation of hydraulic heat distribution (IP-19)
Have the hydraulic distribution network quoted alongside the new heat generator. · File the application before works start: no subsidy is granted for works already under way (art. 24 of the 17 November 1999 Subsidies Act).
OtherMunicipal subsidies — to be searched by postal code
Search for the municipality's and the electricity provider's subsidies by postal code. · File the municipal application BEFORE the works, like the cantonal one.