Building envelopeThermal envelope insulation (M-01)
CHF 60 /m²
Measure the areas and U-values of the insulated elements (roof, façade, floor) per the M-01 sheet. · Submit the request on portal.leprogrammebatiments.ch/ne before work begins. · Plan for a CECB Plus if the subsidy reaches CHF 10,000 (insulated area > 166 m²).
Building built before 2000
Heat pumpAir/water heat pump (M-05) ≤ 70 kWth
from CHF 4'000
Confirm the target air/water HP and its thermal power (≤ 50 Wth/m² ERA). · Check the PAC System module (≤ 15 kWth) or the EHPA label (> 15 kWth). · Submit the request on portal.leprogrammebatiments.ch/ne before work begins.
Heat pumpGround/water or water/water heat pump (M-06) ≤ 70 kWth
from CHF 8'000
Confirm the ground/water or water/water HP solution and the thermal power. · Check the drilling authorisation and the certified geothermal-probe company. · Submit the request on portal.leprogrammebatiments.ch/ne before work begins.
WoodAutomatic wood heating (M-03) ≤ 70 kW
from CHF 4'200
Confirm the automatic wood boiler (pellets or chips) and its heating output. · Check the automatic storage ≥ 500 kg and the SwissEnergy performance guarantee. · Submit the request on portal.leprogrammebatiments.ch/ne before work begins.
District heatingHeat network connection (M-07) ≤ 70 kW
from CHF 4'000
Confirm the heat-network connection and the renewable/waste-heat share ≥ 50%. · Check that the network is not on the PB-NE list of excluded networks. · Submit the request on portal.leprogrammebatiments.ch/ne before work begins.
Solar thermalSolar thermal collectors (M-08)
from CHF 1'200
Confirm the planned solar thermal power (2 to 70 kW). · Check the collectors are on the SPF list with a Swissolar guarantee. · Submit the request on portal.leprogrammebatiments.ch/ne before work begins.
MinergieMinergie renovation (M-12)
CHF 65 – 155 /m²
Confirm the targeted Minergie or Minergie-P label and provide the provisional label. · Confirm the official ERA and building type (single/multi-dwelling) before fixing the amount. · Submit the request on portal.leprogrammebatiments.ch/ne before work begins.
Building built before 2000
CECBCECB class improvement (M-10)
Establish a CECB Plus before works to determine the targeted class improvement. · Plan a renovation covering the envelope and renewable heating. · Submit the request on portal.leprogrammebatiments.ch/ne before work begins.
Building built before 2000
AdvisoryRENO-NE — Heritage-energy mandatary (MApe)
Check the municipality is a RENO-NE partner and mandate a MApe from the official list. · Establish a CECB and confirm the heritage classification (RACN) before applying. · Submit the request on portal.leprogrammebatiments.ch/ne before work begins.