Renovation support

Heat pump subsidy in canton Fribourg

Fribourg supports an air/water, ground/water or water/water heat pump that replaces oil, natural gas or fixed electric heating, up to 70 kW. The amount follows the thermal output, with a flat amount on top for hot water connected to the heating. The application is filed before works, which wait for the decision.

There is no building-age condition for the heat pump, but the building envelope must reach at least CECB class E. Energy regulation in force since 1 September 2025.

Covered rates and scope

Indicative official rate. The final amount depends on the application and cantonal decision.

Who can apply

  • Single-family homes, apartment buildings and the other building categories.
  • Replacing an oil, natural gas or fixed electric resistance heating system with renewable energy.
  • A flat amount is added for hot water production connected to the heating, replacing an existing installation.

What is not subsidised

  • Works in progress or started before the decision: the subsidies act excludes them.
  • Measures the energy regulation already requires.
  • Minergie renovation and CECB class improvement: these routes cannot be combined with heat pump support.
  • Replacing a heat pump or wood heating: they are not among the eligible replaced heating systems.

Technical conditions

  1. Heat pump with an electric motor, 70 kW thermal at most, used as the main heating system.
  2. Building envelope at least CECB class E: a CECB accompanies the application (a provisional version is accepted), then an updated version after works.
  3. Heat pump system-module where the output allows (up to 15 kW thermal); otherwise, a quality label and the SwissEnergy performance guarantee.
  4. Air/water heat pump: seasonal performance factor of at least 2.5, calculated with the Energy Office's tools.
  5. Geothermal probes: a certified drilling company; otherwise, a drilling log drawn up by a qualified geologist.
  6. No support in areas where connection to district heating is mandatory.

The application, step by step

  1. Have the CECB drawn up and request quotes; check that the envelope reaches at least class E.
  2. Create the application on the Buildings Programme portal, then post the signed form; send the other documents (quote, photos, plans and schematic, CECB) preferably electronically.
  3. Wait for the subsidy commitment: works only start once it has been received.
  4. Carry out the works within two years; a single extension of at most six months is possible if the works are nearly complete.
  5. Send the commissioning report, invoices, photos and the updated CECB; the Energy Office checks, then pays.

Check the building by address

Check the building by address

The address identifies the canton and prepares an initial view of plausible support.

Submit the application and wait for the decision required by the programme before starting work or making a binding commitment.

Frequently asked questions

Does my electric heating have to go in Fribourg?

Fribourg law sets no replacement deadline. It bans installing new fixed electric heating and only allows renewing an existing system if at least half the heat is renewable, or if the envelope reaches CECB class C (art. 15 LEn).

What should I plan for when replacing an oil boiler in Fribourg?

In a residential building, the renewal needs the Energy Office's authorisation and a building permit; non-renewable energy may cover no more than 80% of demand. A heat pump for heating and hot water meets this requirement.

My house is rated class F: can I get heat pump support?

Not as it stands: in Fribourg, the envelope must be at least CECB class E. Insulating part of the envelope first can bring the building to class E; insulation support, reserved for buildings authorised before 2000, can be combined with heat pump support.

Does Fribourg support installing water-based heat distribution?

Yes, measure IP-19 helps replace decentralised heaters without hydraulic distribution with renewable heating using radiators or underfloor heating. It can be combined with the heat pump; all decentralised heaters must be replaced, towel rails excepted.

Does the City of Fribourg add support for a heat pump?

Not as a top-up to cantonal heat pump support. It does, however, have separate support for the early replacement of a fossil boiler aged five to nineteen years, to be requested before works.

How long do I have to install the heat pump after the commitment?

Two years from the decision. A single extension of at most six months can be granted if you show before the deadline that the works are nearly complete; otherwise, the commitment lapses.

Official sources and date

retrieved on 2026-11-25