Air/water heat pump <= 70 kW
from CHF 3'500
Open official sourceRenovation support
Fribourg supports an air/water, ground/water or water/water heat pump that replaces oil, natural gas or fixed electric heating, up to 70 kW. The amount follows the thermal output, with a flat amount on top for hot water connected to the heating. The application is filed before works, which wait for the decision.
There is no building-age condition for the heat pump, but the building envelope must reach at least CECB class E. Energy regulation in force since 1 September 2025.
from CHF 3'500
Open official sourcefrom CHF 5'000
Open official sourceIndicative official rate. The final amount depends on the application and cantonal decision.
Check the building by address
The address identifies the canton and prepares an initial view of plausible support.
Submit the application and wait for the decision required by the programme before starting work or making a binding commitment.
Parcellis does not issue energy certificates and is not an accredited body.
Fribourg law sets no replacement deadline. It bans installing new fixed electric heating and only allows renewing an existing system if at least half the heat is renewable, or if the envelope reaches CECB class C (art. 15 LEn).
In a residential building, the renewal needs the Energy Office's authorisation and a building permit; non-renewable energy may cover no more than 80% of demand. A heat pump for heating and hot water meets this requirement.
Not as it stands: in Fribourg, the envelope must be at least CECB class E. Insulating part of the envelope first can bring the building to class E; insulation support, reserved for buildings authorised before 2000, can be combined with heat pump support.
Yes, measure IP-19 helps replace decentralised heaters without hydraulic distribution with renewable heating using radiators or underfloor heating. It can be combined with the heat pump; all decentralised heaters must be replaced, towel rails excepted.
Not as a top-up to cantonal heat pump support. It does, however, have separate support for the early replacement of a fossil boiler aged five to nineteen years, to be requested before works.
Two years from the decision. A single extension of at most six months can be granted if you show before the deadline that the works are nearly complete; otherwise, the commitment lapses.
retrieved on 2026-11-25