Air/water heat pump (M-05) ≤ 70 kWth
from CHF 4'000
Open official sourceRenovation support
In Neuchâtel, the Buildings Programme supports an air/water, ground/water or water/water heat pump that replaces oil, gas or fixed electric heating, up to 70 kW. The amount follows the thermal output, capped at 50 W per m² of heated floor area. The application goes by post, before works begin. General conditions 2026, as of 1 September 2026.
There is no building-age condition for the heat pump: the building's first official valuation only needs to be at least two years old. Support is capped at 50% of the investment.
from CHF 4'000
Open official sourcefrom CHF 8'000
Open official sourceIndicative official rate. The final amount depends on the application and cantonal decision.
Check the building by address
The address identifies the canton and prepares an initial view of plausible support.
Submit the application and wait for the decision required by the programme before starting work or making a binding commitment.
Parcellis does not issue energy certificates and is not an accredited body.
Yes: the cantonal energy act bans fixed electric resistance heating from 1 January 2030 (art. 54 LCEn). In homes, central water heaters running on electricity alone must also be replaced or supplemented by then (art. 55).
For an air/water heat pump, yes: a CECB with an envelope rating of class A to E must be provided. The general conditions do not require one for a ground/water or water/water heat pump.
Yes, measure IP19 helps install water-based heat distribution when decentralised electric, oil or gas heaters are replaced. It can be combined with the heat pump, but needs its own application, also before works.
No: in Neuchâtel, a bivalent installation with fossil energy makes the whole project ineligible. A renewable backup, such as solar thermal or wood, remains allowed.
Yes: both are individual measures, which can be combined. They cannot, however, be combined with renovation by CECB classes or Minergie in the same project, and the route cannot be changed midway.
In an existing home, non-renewable energy may cover no more than 80% of heat demand after the replacement; fully renewable heating is required where technically possible at no extra cost (art. 53 LCEn).
No: this on-site advice from an approved expert is free for the owner and funded by the Confederation. It helps choose the system before asking for quotes.
retrieved on 2026-11-25